首页>
外国专利>
Technical product production planning method for motor vehicle, involves using latest tool time as availability time of component, and computing latest availability time of all components as earliest time for production of product
Technical product production planning method for motor vehicle, involves using latest tool time as availability time of component, and computing latest availability time of all components as earliest time for production of product
The method involves determining if a memory contains a construction model of a component of a product, for making a tool, and if an electronic tool data memory contains information starting from the available time for assembly. A latest tool time is used as an availability time of the component, and a latest availability time of all components of the product is computed as an earliest time for the production of the product. Independent claims are also included for the following: (A) a computer program product with a computer readable medium comprising a program for planning technical product production (B) a data processing equipment for planning the production of a technical product.
展开▼