机译:Bugey 4和Tricastin 1核电站的51a和51m型蒸汽发生器的试验。总结报告

获取原文

摘要

Following some incidents on a number of US steam generators (SGs), alterations were made to the Westinghouse SGs of series 51 installed on the EDF 900 MW units. To check the merits of these alterations and to better understand the operation of this equipment, a series of tests were run on SG No. 14 of Bugey 4 and No. 20 of Tricastin 1 nuclear units. The tests results are described. (ERA citation 08:005062)