首页> 美国政府科技报告 >Reduction of Nuclear Refueling Outage Time for Increased Plant Availability. Phase I Summary Report
【24h】

Reduction of Nuclear Refueling Outage Time for Increased Plant Availability. Phase I Summary Report

机译:减少核加油停机时间以提高工厂可用性。第一阶段总结报告

获取原文

摘要

During 1977, Combustion Engineering, Inc. (C-E) and Omaha Public Power District (OPPD), under contract to the United States Department of Energy (formerly ERDA), completed Phase I of a study to improve nuclear power plant availability through the reduction of refueling/maintenance outage time. This report discusses the following recommended improvement areas and provides the basis for these recommendations: (1) outage management improvements, (2) state-of-the-art equipment for existing plants, (3) equipment requiring development for existing plants, and (4) new plant design changes. The potential benefits with respect to alternate fuel conservation, personnel radiation exposure and finances are summarized. (ERA citation 03:052629)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号