...
首页> 外文期刊>Concrete >Tunnelling under King Fahd Flyover, Riyadh
【24h】

Tunnelling under King Fahd Flyover, Riyadh

机译:利雅得法赫德国王天桥下的隧道

获取原文
获取原文并翻译 | 示例
           

摘要

In February, the last concrete pour of the tunnel section under King Fahd Flyover took place marking the completion of the cut-and-cover tunnel being constructed in the heart of the Saudi Arabian capital, Riyadh. The project itself is a significant undertaking by Arriyadh Development Auth ority (ADA) with the aim to increase the King Abdullah Road capacity from the current 190,000 to 520,000 vehicles a day. This will be achieved by increasing the width of the existing road corridor and grade separating the key junctions. In addition to increasing the vehicle capacity of the road, provision has been made for a future light- rail corridor within the tunnel.
机译:2月,法赫德天桥国王下的隧道区段的最后一次混凝土浇筑进行了,标志着在沙特阿拉伯首都利雅得市中心建造的明挖式隧道的完工。该项目本身是Arriyadh Development Authority(ADA)的一项重大任务,目的是将阿卜杜拉国王路的载客量从目前的190,000辆增加到每天52万人。这将通过增加现有道路走廊的宽度和分隔关键路口的坡度来实现。除了增加道路的车辆通行能力外,还为隧道内未来的轻轨走廊做好了准备。

著录项

  • 来源
    《Concrete》 |2011年第5期|p.3840-41|共3页
  • 作者

    Nasser Khawandi; Bum Happold;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号