...
首页> 外文期刊>Concrete >First FlexiArch bridge installation for Lancashire
【24h】

First FlexiArch bridge installation for Lancashire

机译:兰开夏郡的第一个FlexiArch桥安装

获取原文
获取原文并翻译 | 示例
           

摘要

Construction by Lancashire County Council of the county's first FlexiArch flat pack modular arch bridge system is currently underway in Burscough, Lancashire. Installation of the 6.8m-wide road bridge commenced in March onto pre-prepared springing blocks and foundations. The FlexiArch package, provided by Macrete, consists of six arch ring elements each of lm width, composed of 23 tapered precast blocks linked on their upper surface by a cast-in flexible membrane, which allows the arch ring strip to fall into its desired self-supporting arch shape as it is lifted from the flat-bed HGVtransporter. The package is completed by the provision of two precast spandrel walls.
机译:兰开夏郡县议会目前正在兰开夏郡的伯斯考进行该县首个FlexiArch平装模块化拱桥系统的建设。宽6.8m的路桥已于3月开始在预先准备的弹性块和地基上安装。 Macrete提供的FlexiArch软件包由六个弓形环元素组成,每个元素的宽度为lm,由23个锥形预制块组成,这些块在其上表面通过铸塑柔性膜连接,从而允许弓形环带落入所需的自身位置-从平板HGV运输车上抬起时的支撑拱形。该包装是通过提供两个预制的墙托壁来完成的。

著录项

  • 来源
    《Concrete》 |2011年第5期|p.6|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号